Pace Edwards Company2400 Commercial Blvd.Centralia WA 98531(800) 338-3697 toll free(360) 736-9991 main(360) 237-7839 faxwww.paceedwards.comRUBC-I
UTILITY BED COVER INSTALLATION INSTRUCTIONS 11
Pace Edwards Company2400 Commercial Blvd.Centralia WA 98531(800) 338-3697 toll free(360) 736-9991 main(360) 237-7839 faxwww.paceedwards.com
TOOLS REQUIRED FOR ASSEMBLY: BEFORE YOU START:PACKAGING CONTENTS:Electric Drill1/4” drill bit,1/2” drill bit9/32 Allen WrenchRead the instructions ca
UTILITY BED COVER INSTALLATION INSTRUCTIONS
2. INSTALLING THE HORIZONTAL RAILSThe tailgate end of the rail can damage your box during installation; we recommend wrapping the ends of the rails or
4. INSTALL AND MATCH DRILL THE HORIZONTAL RAIL CLAMPS UTILITY BED COVER INSTALLATION INSTRUCTIONS 5 Make sure the canist
UTILITY BED COVER INSTALLATION INSTRUCTIONS 7Temporarily remove the end cap screw. (Figure 8A)Slide the clamps on the
INSTALLING THE OPTIONAL TAILGATE LOCKTHIS IS ONLY USED WHEN YOUR COVER GOES TO THE TOP OF THE TAILGATE AND YOUR TAILGATE IS NON-LOCKING. IT IS AN OPT
Comentarios a estos manuales